IHE Concrete Implementation Meeting Agenda and Notes - 2010-05-12

From Direct Project
Jump to navigation Jump to search
Meeting of: IHE Concrete Implementation Team
Status of Notes: DRAFT
Date: May 12, 2010
Time: 2:00 -3:30 PM Eastern Time
Attendees: Karen Witting, Matt Potter, Vince Lewis, Parag More, Peter DeVault, Janet Campbell

Call Information

Vassil Peytchev has invited you to attend an online meeting using Microsoft Office Live Meeting. [1]

AUDIO INFORMATION

· Use the information below to connect:
Toll: +1 (608) 410-6700
Participant code: 7774835
Add the information to your calendar.


Actions


#
Date
Action
Status
Owner
Due Date
1
5/12
Prepare demo systems for participation
Open
GE, Epic, MA
5/19
2
5/12
Work on combined effort for conversion from email+CCD to XDR (for case 3)
Open
GE, MA
5/19
3
5/12
Review and propose mapping of abstract address to Intended Recipient
Open
Vassil
5/17
4






Decisions


#
Date
Decision
1
May 12

The following scenarios will be demonstrated:

  1. Case 1 - EMR to EMR
    IHE_case1.png
    The roles will be played by GE (Source), MedAllies (Source HISP), and Epic (Combined Destination HISP/Destination)

  2. Case 2 - EMR to email client, sending an XDM package on the edge to the destination
    IHE_case2.png
    The roles will be played by Epic (Combined Source/Source HISP), MedAllies (destination HISP), and an e-mail client

  3. Case 3 - e-mail client to PHR, using simple SMTP with a CCD as the attachment from the Source
    IHE_case3.png
    The roles will be played by an e-mail client (Source), Combined effort by GE and MedAllies as the Source HISP, and Epic as the combined Destination HISP / Destination.

  4. Case 4 - e-mail client to e-mail client, using XDM on the edges (nice to have, the other three are a priority)
    IHE_case4.png
    Roles have not been decided yet, the Source HISP is currently unclear.


Notes


Agenda


  1. Review of actions from previous meeting
  2. Discussion based on Issue Framing
  3. Review of actions and decisions



Issue Framing

  1. Review To Do list form Wiki:
    1. Establish HISP-to-HISP communications
    2. Determine the scope of the edge protocols
    3. Design demo to showcase an implementation
  2. Introductions and goals

Discussion

The discussion started with presenting the To Do list from the Wiki page. Agreement was reached that HISP-to-HISP (backbone) protocol is the main focus of implementatiion, and that Karen's proposal to limit the edge protocols to XDM and XDR for the purposes of intial implementation is appropriate.

The introductions and goals of the participants led the discussion of what to present for the IHE Implementation for the week of June 6. MedAllies has test systems which can function as HISPs, including two test domains which can talk to each other, and XDR to XDM transformation at the destination. GE has a test system which can be an XDR Document Source, Epic has a test system which can be both an XDR Document Source and and an XDR Document Recipient. 4 cases were discussed (see decision table).

It was noted that it would be nice to have the Comprehensive HIE interoperability user story as the basis for the demo, but unlikely to have time to add to the NHIN-Direct transactions for the week of June 6. We need to map the demo cases to the NHIN Direct user stories.

Wrap Up

Several action items were recorded.